Alberta Infrastructure has requested that the existing Lenel Access Control System (hardware and software) be replaced with a new Access Control Syste...
m (ACS) that meets Infrastructure Design
Specifications. This includes the replacement of all servers, workstations, controllers and door hardware associated with the (90) doors currently using the Lenel system. The (90) doors consist of (20) hardwir
🔓 Sign up free to read the full description and access 177,000+ tenders
Get instant access to complete tender details, deadlines, and AI-powered matching.
Create Free AccountAlready have an account? Sign in
Alberta Infrastructure has requested that the existing Lenel Access Control System (hardware and software) be replaced with a new Access Control System (ACS) that meets Infrastructure Design
Specifications. This includes the replacement of all servers, workstations, controllers and door hardware associated with the (90) doors currently using the Lenel system. The (90) doors consist of (20) hardwired locations, (70) wireless door locks communicating through (10) wireless access points (WAP) and (5) maglock doors. The maglocks are to be removed and converted to electric strike doors. The new ACS must be able to integrate with Intrusion alarm devices to provide a single interface.
The Synology Video Surveillance System (VSS) is also to be replaced with a new VSS that meets Infrastructure Specifications. The existing (82) camera system is to be replaced with a (66) camera
system by upgrading legacy Panasonic and Eyesonic cameras with new high resolution multi-sensor cameras throughout the interior and exterior of the building. In addition to replacing the existing cameras, Alberta Infrastructure would like to add (14) new cameras to the parkade, which will require all new cabling and network infrastructure.
Wherever possible Alberta Infrastructure would like to reuse existing cable and network infrastructure to reduce the overall cost of the project as well as minimize impact to operations of the Jubilee Auditorium.
For complete work, please review the issued RFP Package.