Temporary warming Botsen

Buyer

STATSBYGG

Country

NO

Source Portal

EU TED

Deadline

12 October 2026

Estimated Value

Not specified

Published

07 September 2026

Description

Statsbygg requests tenders for temporary heating of Botsen.The aim is to establish a reliable and comprehensive system for heat production based on pe...

llets, where the tenderer is responsible for the total responsibility for the energy delivery. Buildings and energy need Property: BotsenHeated building area: approx. 17,000 m² Estimated annual energy consumption: approx. 450,000 kWh Estimated highes

🔓 Sign up free to read the full description and browse 100,000+ open tenders

Get instant access to complete tender details, deadlines, and AI-powered matching.

Create Free Account

Already have an account? Sign in

Statsbygg requests tenders for temporary heating of Botsen.The aim is to establish a reliable and comprehensive system for heat production based on pellets, where the tenderer is responsible for the total responsibility for the energy delivery. Buildings and energy need Property: BotsenHeated building area: approx. 17,000 m² Estimated annual energy consumption: approx. 450,000 kWh Estimated highest energy need per month: approx. 90,000 kWhEseen the highest energy need per hour: 150 kWTur temperature at the connection point must be delivered at minimum 55 degrees for an effect need of 150 kW.The energy shall only be used for heating. The building is currently heated by district heating, which it receives from the existing prison, which is still active.  This system will be disconnected from 15.02.27.

Share this tender: 💼 LinkedIn 𝕏 Twitter ✉️ Email 💬 WhatsApp

Want AI-powered matching? Create your profile to see how well this tender matches your capabilities.